pdf GSP 256-150-200 I2 C.O. Cross-Connecting Jumpers Popular

By 1759 downloads

Download (pdf, 6.00 MB)

256-150-200 C.O. Cross-Connecting Jumpers.pdf

GSP 256-150-200 I2 C.O. Cross-Connecting Jumpers

GENERAL SYSTEM PRACTICES       
SECTION 256-150-200
ENGINEERING-PLANT SERIES       
ISSUE 2, JULY, 1967
GT&E STANDARD

PROCEDURES FOR CROSS-CONNECTING (JUMPERING)
CENTRAL OFFICE DISTRIBUTING FRAMES


CONTENTS
1. GENERAL
2. JUMPER WIRE 
3. TOOLS .
4. CENTRAL OFFICE EQUIPMENT
5. RUNNING JUMPERS        
6. TYING DOWN JUMPERS 
7. SOLDERING JUMPERS 
8. WORKING SERVICE ORDERS
9. TESTING 
10. CABLE TRANSFERS
11. SPECIAL CONDITIONS 

1. GENERAL
1.1This section covers general information on procedures for
cross-connecting (jumpering) central office distributing frames.

1.04 Cross-connection work is one of the most important operations
performed in the central office. In the interest of good service and
economical maintenance, personnel performing frame work should be
familiar with the methods described in this section.

Copyright ? 1967 Automatic Electric Company

New User?

Read the articles under "Introduction" in the black menu bar above.

Recent Contributors

Thanks for new documents from Jim Hurtle, Ed Palazzo, Paul Fassbender, Bruce Patterson, Remco Enthoven, Jon Kolger, Paul Ivester, Len Hicken, Fred Haynes, Kurt Rudolph, Wade ("Kellogg KITT"), the Connections Museum, Rick Walsh, Jeff Lamb, Jeremy Walters, Alan David, Dennis Hock, and Tim Griffin.

Please send a file to add your name to this list!

Who's online

We have 608 guests online