pdf GSP 256-150-200 I2 C.O. Cross-Connecting Jumpers Popular
1824 downloads
256-150-200 C.O. Cross-Connecting Jumpers.pdf

GENERAL SYSTEM PRACTICES
SECTION 256-150-200
ENGINEERING-PLANT SERIES
ISSUE 2, JULY, 1967
GT&E STANDARD
PROCEDURES FOR CROSS-CONNECTING (JUMPERING)
CENTRAL OFFICE DISTRIBUTING FRAMES
CONTENTS
1. GENERAL
2. JUMPER WIRE
3. TOOLS .
4. CENTRAL OFFICE EQUIPMENT
5. RUNNING JUMPERS
6. TYING DOWN JUMPERS
7. SOLDERING JUMPERS
8. WORKING SERVICE ORDERS
9. TESTING
10. CABLE TRANSFERS
11. SPECIAL CONDITIONS
1. GENERAL
1.1This section covers general information on procedures for
cross-connecting (jumpering) central office distributing frames.
1.04 Cross-connection work is one of the most important operations
performed in the central office. In the interest of good service and
economical maintenance, personnel performing frame work should be
familiar with the methods described in this section.
Copyright ? 1967 Automatic Electric Company
New User?
Read the articles under "Introduction" in the black menu bar above.
Recent Contributors
Thanks for new documents from Lou Maffei, Rick Thoensen. Paul Fassbender, Sheila Flory, Tom Hesson, Jim Hurtle, Ed Palazzo, Bruce Patterson, Remco Enthoven, Jon Kolger, Paul Ivester, Len Hicken, Fred Haynes, Kurt Rudolph, Wade ("Kellogg KITT"), the Connections Museum, Rick Walsh, and Jeff Lamb.
Please send a file to add your name to this list!
30 Latest Additions
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Beco 1011-DTP User Manual Popular
-
-
-
-
-
-
-
-
-
-
Who's online
We have 337 guests online
Hints for using the TCI Library
Three search options.
When browsing, to change the category listing view from normal to compact, click on Browse the Library in the black menu bar.