pdf GSP 256-150-200 I2 C.O. Cross-Connecting Jumpers Popular
By Anonymous 1738 downloads
256-150-200 C.O. Cross-Connecting Jumpers.pdf
GENERAL SYSTEM PRACTICES
SECTION 256-150-200
ENGINEERING-PLANT SERIES
ISSUE 2, JULY, 1967
GT&E STANDARD
PROCEDURES FOR CROSS-CONNECTING (JUMPERING)
CENTRAL OFFICE DISTRIBUTING FRAMES
CONTENTS
1. GENERAL
2. JUMPER WIRE
3. TOOLS .
4. CENTRAL OFFICE EQUIPMENT
5. RUNNING JUMPERS
6. TYING DOWN JUMPERS
7. SOLDERING JUMPERS
8. WORKING SERVICE ORDERS
9. TESTING
10. CABLE TRANSFERS
11. SPECIAL CONDITIONS
1. GENERAL
1.1This section covers general information on procedures for
cross-connecting (jumpering) central office distributing frames.
1.04 Cross-connection work is one of the most important operations
performed in the central office. In the interest of good service and
economical maintenance, personnel performing frame work should be
familiar with the methods described in this section.
Copyright ? 1967 Automatic Electric Company
New User?
Read the articles under "Introduction" in the black menu bar above.
Recent Contributors
Thanks for new documents from Ed Palazzo, Bruce Patterson, Jon Kolger, Paul Ivester, Len Hicken, Paul Fassbender, Fred Haynes, Kurt Rudolph, Wade ("Kellogg KITT"), the Connections Museum, Rick Walsh, Jeff Lamb, Jeremy Walters, Mark Cuccia, Alan David, Harry Joseph, Charlie Terry, Karl Brose, Dennis Hock, Tim Griffin, Remco Enthoven, and Steve Cichorsky.
Please send a file to add your name to this list!
Who's online
We have 563 guests online